DC1 — Grid Interface Control and Runtime Verification

Host: Technical University of Denmark (DTU), Lyngby, Denmark — Distributed Energy Systems section, DTU Wind and Energy Systems.
Work package: WP1 (Programmable Energy-Integrated Infrastructure)
Duration and start: 36 months, full-time; start between February and September 2027 (latest start September 2027).

The project

An edge datacenter can only sell fast grid services — for example, helping hold the grid’s frequency steady within a second — if it can promise that doing so will never push the site past its own safety limits. In this project you build the safety foundation for that promise.

You will create a runtime verification framework: software that watches the datacenter as it runs and checks, against formal rules written in temporal logic, that every grid action stays inside safe operating bounds. This turns the site from an unpredictable load into a grid resource that operators can trust.

What you will work on:

What you will deliver:

Secondments

You will spend two research visits with partners in the network:

The host

The Distributed Energy Systems section at DTU Wind and Energy Systems develops digital solutions for operating and controlling distributed energy resources and integrated local energy systems.

Supervision

Main supervisor: Henrik Bindner (ORCID) — Senior Researcher and Head of the Distributed Energy Systems section, DTU Wind and Energy Systems. His work focuses on smart grids and data-driven control of distributed energy resources.

Co-supervisors:

Profile we are looking for

You must also meet the MSCA eligibility rules — no PhD yet, the mobility rule, and open to all nationalities.

How to apply

Official vacancy at the host institution: link coming soon.

Until then, apply through the central AEGIS application portal: AEGIS application portal (reference position DC1), and read what to include in your application.

Questions about this position? Contact the coordinator, Prof. Paul Pop, aegis@compute.dtu.dk.